APB
Build RoadmapAPB South · admin gap analysis
← Command Center
Admin system · what exists, what's missing, what's next

The tools we have, and the ones the yard actually needs

The planning layer is largely built — the plan, the survey, the due diligence, the maps. What is thin is the operating layer: the tools that run a yard on a Tuesday. This page is the honest gap analysis and the build order to close it.

12tools built
6critical gaps
8secondary gaps
3build waves
The pattern in the gaps. Everything built so far helps us decide whether to take the yard and how to start it. Almost nothing built so far helps us run it once it's ours. That is the whole finding. The critical gaps below are all operating tools, and three of them are things the business plan explicitly commits to — a vessel register (Day-1 tagging and non-payer clearance), a lift schedule (the cash register), and unified billing ("everything runs through us").
Built & working
Live
Command Center
Situation report, hub for every tool
Live
Business Plan
15 sections, market research, 30/60/90 · 1–10yr · 50–100yr
Live
30-Day Activation Plan
Week-by-week, vessel triage, revenue switch-on
Live
Survey & Value Plan
Acquisition scoring by value lever
Live
Due Diligence
Property, title, environmental, utilities
Live
Berth Planner
Slip inventory + reservation Gantt, conflict & LOA misfit detection
Live
Facility Map
Draw slips, docks, pedestals, safety assets
Live
Sweep Kit
Aug 10 field checklist
Live
Property Intelligence
Market comps, rates, competitive set
Live
Website Integration
Combining apb1 + robbieskw
Live
Public site + portals
Marketing site, customer/vendor/employee/welder
Live
The Store
58 products, native, brand + category filters
The gaps
Missing toolWhat it does & why it mattersPriority
Vessel Register A persistent record for every boat on the property: owner, contact, agreement, is it actually paying, LOA, location, condition photos, triage tag (move / clean-around / legal-hold), and the stage of any legal process. This is the Day-1 job and the engine of the non-payer clearance — the fastest capacity win in the plan. The Sweep Kit is a checklist; it does not persist per-vessel records. Critical
Haul-Out Scheduler The travel lift's own calendar — day and time slots, block assignment, launch dates, crew. The Berth Planner schedules slips by day; the lift is a different resource with a different rhythm, and it is the cash register. Nothing schedules it today. Critical
Work Orders & Billing Estimate → authorization → work order → labor & materials → invoice → collection. The lease and the plan both commit to "everything runs through us including billing." Right now nothing implements that sentence. Also the source of every KPI worth reporting. Critical
Financial Model The Section 08 pro forma as a live model — change occupancy, haul count, rate, or crew size and watch EBITDA move. Needed to re-underwrite on Aug 10 survey data, and to answer an investor's "what if you're half right?" in the room rather than a week later. Critical
Vendor Portal — self-service
THIS IS THE BUSINESS MODEL
Not back-office software — the competitive advantage itself. The whole position ("vetted, not gatekept — easier to work at than any yard in Florida, still fully insured") is only deliverable if qualifying is automated. Vendor uploads their own insurance certificate → auto-verified → PIN issued tied to status and length of stay → submits invoices through the same portal → flows into one customer bill. Expiry warnings automatic; no PIN without a current certificate; no staff chasing paperwork and no gate guard on payroll. Every day this doesn't exist, the yard runs on manual exceptions and the differentiator is just a slogan. Critical
Customer Records Customers as real entities linked to their vessels, reservations, work orders, and invoices. Today a booking holds a vessel name and nothing else. Also what the customer portal needs behind it to be more than a demo. High
Permits, Insurance & Compliance Tracker Every permit, license, lift certification, and insurance policy with issue and expiry dates and an owner. In a marine yard these are gates on revenue — an expired lift certification stops the cash register. High
Build-Out Stage Tracker Section 11's five stages as a live project board — clear/gate, seawall & shops, road & offload, fuel, heavy lift — with budgets, gates, permits, and status. Turns the plan into something you manage instead of re-read. High
Capital & Cost Recovery Ledger The lease creates a recoverable capital account for APB's self-performed labor, equipment, and improvements, recovered ahead of profit splits. If it is not tracked contemporaneously it will not be recoverable — this is real money that quietly evaporates without a ledger. High
Stakeholder Directory Who to call: Monroe County, FWC, DEP, licensed salvors, Keys Energy, utilities, lift service techs, marine counsel, insurers. Scattered across pages today; needed as one list on the truck on Aug 10. Medium
KPI Dashboard Occupancy, hauls per week, revenue vs. plan, AR aging, backlog. The weekly principal reporting the lease requires. Depends on work orders and billing existing first — which is why it is not critical yet. Medium
Document Vault Lease drafts, surveys, titles, environmental reports, insurance policies, permits — one indexed place. Currently living in folders and email. Medium
PIN & Access Control The issuing side of the gate: a PIN per person tied to status (customer / vendor / tenant / contractor) and to length of stay, expiring automatically, refused if insurance has lapsed — plus the access log it generates. This is what replaces a gate guard, so it moves up with the vendor portal rather than waiting. High
Shared database (Supabase) Not a page — the foundation under all of them. Every tool currently stores data in one browser. That is fine for design and demo, and unworkable for operations: your laptop and the yard office would hold different truths, and nothing survives a cleared cache. Real multi-user data is the prerequisite for going live. Critical
Build order
Wave 1 — Make the pitch bulletproofBefore Aug 10What you need in front of Nate and capital
  1. Financial Model — live pro forma driven off the Section 08 build. Highest leverage on the money conversation, and it makes every other number defensible.
  2. Vessel Register — because the Aug 10 sweep is a vessel census. Walk the yard, fill the register, and the survey output lands in a structure instead of a notebook.
  3. Stakeholder Directory — small, fast, and genuinely needed on the truck that day.
Wave 2 — Make it operableSignature → day 30The tools that run the yard
  1. Shared database — move the existing tools off browser storage. Do this first in the wave or everything built on top has to be rebuilt.
  2. Vendor Portal + PIN issuance — the operating model itself. Self-serve insurance upload → verification → PIN by status and stay → invoice submission. Without it, "vetted but frictionless" is a slogan and someone ends up chasing certificates by email.
  3. Haul-Out Scheduler — the lift is the cash register; it needs its own calendar from the first paid haul.
  4. Work Orders & Billing — makes "everything runs through us" real, and starts the audit trail on day one rather than retroactively.
  5. Customer Records — the identity table the portal, bookings, and invoices all reference.
Wave 3 — Make it accountableDay 30 → 90Reporting, compliance, and the build-out
  1. Permits, Insurance & Compliance Tracker — before an expiry surprises us mid-season.
  2. Capital & Cost Recovery Ledger — must run from the first self-performed hour to be worth anything.
  3. KPI Dashboard — the weekly principal reporting the lease requires; now has real data underneath it.
  4. Build-Out Stage Tracker, Document Vault, Gate & Access Log.
One judgement call worth stating plainly. The instinct is to build more planning tools, because they are satisfying and they demo well. The yard does not need more planning tools. It needs a vessel register, a lift calendar, and an invoice — and it needs them on a shared database rather than in a browser. Wave 1 exists to win the room; Wave 2 is what actually makes money.
Working document — APB South admin build roadmap. Priorities reflect the operating commitments in the business plan and the 30-day activation plan; they are a recommendation, not a decision. Gap list current as of July 2026 and expected to change after the August 10 site survey.